Types of Cost Estimates

An estimate is an analysis made for the amounts of various types of project-related activity as well as their associated costs.

An estimate of the entire construction cost or the expected cost of project work will be provided by adding up the costs of all the work done by a construction cost estimator. It also helps you know about the pros & cons of construction estimation.

It should be noted that the work’s computed cost will be rather close to its actual cost. For all initiatives to be cost-effective, an accurate cost estimate is required.

Let’s examine the different types of project cost estimation utilized in construction:

Preliminary Estimate

Preliminary cost estimates is often referred to as an approximation, an abstract, or a budget estimate. It is typically done during the initial stages of project planning to acquire a sense of the project’s approximate cost. The project authority will be able to determine the financial situation and policy required for the administration section with the aid of this estimate.

Thorough Cost Estimation

After a preliminary estimate has been approved by the appropriate administrative authority, a detailed estimate will be created. Every task will be precisely measured and its cost will be determined independently for this estimate. Compared to other methods of estimation, this construction cost estimation is one of the most essential.

A thorough estimate will include:

  • Overall Provisions
  • All Detailed Provisions
  • Plans & Visuals
  • Computation & Designs

Amended Estimate

When the project’s initial cost is surpassed by 6% or more, the revised estimate is calculated. Although it is a thorough cost estimate, the project’s cost was incorrectly calculated or underestimated, and it has to be updated.

The cost of supplies, shipping, and other factors might all have increased, which is why a revised estimate was prepared. On the final page of the revised estimate, it must be stated the main motivation behind its creation. You must go for professional cost estimating services for this purpose.

Supportive Cost Estimate

The supportive cost estimate is an add-on to your amended estimate and should be created from scratch whenever a new work is required but the initial project is still in process.

After the supportive estimate has been approved, the total projected cost should also include the cost of any additional work for which approval is necessary.

Hire an Expert Estimation Company